Dramix Going to Work Whilst Toll do too

Toll needed a way to refurbish their existing container storage pavements at their Port of Brisbane chemical facility, whilst it remained fully operational. A Dramix 4D Combi Slab was the perfect solution. Inertia Engineering worked with BOSFA to design a Seamless pavement to carry the huge loads and eliminate all of the joints and saw-cuts, and one that could be constructed in stages. This was a great outcome.

Developer – Toll Group
Builders – Vaughan Constructions
Engineers – Inertia Engineering
Premix Suppliers – Holcim Concrete
Contractor – Kraftur

Technical solution:

  • Dramix 4D 65/60BGE at 35kg/m3