Client/Developer: MetLifecare Limited
Engineer: Calibre Consulting
Contractor: Fosters Construction
Ready Mix Supplier: Firth Industries

An innovative solution using Dramix 5D steel fibre reinforcing to reduce the amount of conventional reinforcement required for shear, bending moment and crack control. The solution proved to be quicker, easier and more cost effective than the traditional more labour intensive option.

In the red-hot New Zealand construction market, reducing the time to fix and tie steel reinforcing can provide major benefits to a construction programme. Calibre Consulting Engineers utilised Dramix 5D 65/60 BG fibre to redesign this 900mm deep, 1000m2 raft slab, resulting in the elimination of a significant volume of conventional reinforcing. The combined solution (fibre + conventional reinforcing) provided equivalent structural performance and crack control with approximately 40% less conventional steel, all designed in accordance with NZS3101. The revised design was significantly faster to construct and approximately 10-15% cheaper than the original design.

Engineer: Calibre Consulting
Main Contractor: Envision Eighty20
Concrete Contractor: Structural Concrete Solutions
Concrete Supplier: Firth Industries

WWWHP (World Wide Warehouse Hai Phong) continued building the next phrase of their renting warehouse. The project is a suspended slab with 5400m2 floor area. The client wanted to have a flat floor according to Fm2 – TR34, the floor has been cast using a strip method, utilising a Dramix®  4D Combi slab solution enabling tight crack control and removing expansion joints.