CALL 1300 665 755 (AUS) OR 0800 665 755 (NZ)

  • External Combi Slab
  • Client/Developer/Engineers: Federal Group Construction
  • Contractor: Conset Construction
  • Ready Mix Supplier: Firth Industries

Developer: DEXUS
D&C Head Contractor: QANSTRUCT
Structural Engineer: Cosentino Group
Concrete Placer: Calibre Group
Slab Design Consultant: Prascon
Concrete Supply: HYTEC

Developer: – Aramex
Builders: – Tomkins Commercial and Industrial
Engineers: – Northrop Consulting
Premix Suppliers: – Holcim Concrete
Contractor: – SETC

Developer:- Frasers Property
Builders:- CIP Constructions
Engineers:- Spencer Group Engineering
Premix Suppliers:- Neilsens
Contractor:- Pourtek Concrete

Client/Developer – Fraser’s Industrial
Engineer – Costin Roe Consulting
Builder – Hansen Yuncken
D&B Contractor – Azzurri Concrete
Ready Mix Supplier – Western Suburbs Concrete

This new 14,600m2 facility is the first of many to be constructed around the world for manufacturing electrolysis for the production of Hydrogen.
FFI and Hutchies needed a high quality flat floor for the mostly automated facility, and Dramix was the obvious choice.

Developer: – Fortescue Future Industries
Builders: – Hutchinson
Engineers: – Tungsten Structures
Premix Suppliers: – Boral Concrete
Contractor: – Top End Steel Fixing

Client/Developer: Balar Family Trust
Engineer: Engenium
D&B Contractor: Hanham & Philp Contractors Ltd
Ready Mix Supplier: Ashby’s Ready Mixed (Allied Concrete)

WWWHP (World Wide Warehouse Hai Phong) continued building the next phrase of their renting warehouse. The project is a suspended slab with 5400m2 floor area. The client wanted to have a flat floor according to Fm2 – TR34, the floor has been cast using a strip method, utilising a Dramix®  4D Combi slab solution enabling tight crack control and removing expansion joints.

A 17.000m2 warehouse owned by LBL Prime Properties Inc in Manila. This project is awarded to our accredited flooring contractor, Nippontech, who did a good job in casting the slab on grade solution for the owner. Dramix 3D 80/60BG was used in this project with guidance from Nippontech to ensure that the subbase and the gravel bed was prepared well before the execution of the floor. Subbase preparation is key to the success of any slab on grade project and ensure longevity and performance from the product. Well done to Nippontech.

The project was designed under ‘crack width’ consideration. With benefit of steel fibre, we could utilize the performance of steel fibre together with conventional reinforcement to act as moment resistance and crack control at the same time. The design provided a cost effective solution which met both ultimate and serviceability requirements.

High performance steel fibre Dramix®  4D plus mesh was used to carry 140kN post load. The Combi Slab solution makes it possible to design a monolithic slab, without joints, to meet tight rotation requirements from ASRS supplier. Providing an exceptional finished product.

Coca Cola Amatil new Distribution Facility in Queensland Australia, a 30,000m2 warehouse. This warehouse includes 9,000m2 of High-Bay Racking with an automated storage handling system. At 35 metres high, and with post loads of 27 Tonnes, the most suitable solution was a Seamless Combi Slab.   The remaining 21,000m2 uses our more typical Jointless slabs with Dramix 3D 65/60BG at 30kg/m3. With Dramix 4D initialised in the many foundations on the project as well.   McVeigh consulting engineers worked very closely with BOSFA and Bekaert® in determining the right solution for the Combi Slab to accommodate the different sorts of loading that will be applied to the slab. And they were able to utilise our Bekaert® Software to confirm the designs themselves for the fibre only slabs and the foundations.  A great example of everyone working together, with the tools available, to achieve the best possible solution in multiple applications on the one high profile project.

The new 27,000sqm Northline facility in Regency Park, South Australia utilised the tried and tested Dramix fibre only jointless solution for the internal slabs. With the external slabs adopting a Dramix Combi Slab, enabling the removal of all saw cuts and all dowelled joints from the pavement. Having no joints makes for the most efficient design with the additional benefit of long term reduced maintenance cost with the removal of costly jointing systems.

Design Engineers
BOSFA / FMG Engineering
Contractor
Maranello Concrete Constructions PL