Global Energy – Gladstone

Fortescue Future Industries build the first of their new green energy production facilities in Gladstone with Dramix

This new 14,600m2 facility is the first of many to be constructed around the world for manufacturing electrolysis for the production of Hydrogen.
FFI and Hutchies needed a high quality flat floor for the mostly automated facility, and Dramix was the obvious choice.

Developer: – Fortescue Future Industries
Builders: – Hutchinson
Engineers: – Tungsten Structures
Premix Suppliers: – Boral Concrete
Contractor: – Top End Steel Fixing

Technical solution:

Benefits

• High quality jointless slabs
• Faster construction and less labour in a regional location
• Highly burnished flat floors