Logistics Warehouse Facility
Saw Cut Free Logistics Warehouse Pavement
This was an external pavement for a logistics/warehousing facility with container and forklift loads. Dramix 4D Combi Slab was used to remove all the saw cuts and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.
Technical solution:
- 35mpa concrete
- Dramix 4D 65/60BG
- Light mesh
Benefits
Sped up construction
Reduced slab thickness
No saw cut joints
Significantly reduced ongoing maintenance costs
More cost effective then a conventionally reinforced slab
Cost neutral compared to a fibre only reinforced slabs with sealed saw cuts.