New concrete Plant, Berkley Vale, Central Coast for Easymix Concrete

Concrete plant covering 2000m2. Spoon drains all over the yard to facility water management.
Detailing for joints became a major headache.

Areas where spoon drain affected the material hoppers and front end loader operation slab design changed to 4D Combi Slab unrestrained

Technical solution:

  • DRAMIX Combi Slab
  • Dramix 4D 65/60 + light mesh
  • Reduced Joints
  • Reduced Maintenance
  • Environmental Control

Benefits

Removal of all control joints meant that there was no issue with regard to water penetration and increased slab integrity.