New concrete Plant, Berkley Vale, Central Coast for Easymix Concrete
Concrete plant covering 2000m2. Spoon drains all over the yard to facility water management.
Detailing for joints became a major headache.
Areas where spoon drain affected the material hoppers and front end loader operation slab design changed to 4D Combi Slab unrestrained
Technical solution:
- DRAMIX Combi Slab
- Dramix 4D 65/60 + light mesh
- Reduced Joints
- Reduced Maintenance
- Environmental Control
Benefits
Removal of all control joints meant that there was no issue with regard to water penetration and increased slab integrity.