Japanese Tobacco International (JTI)
Batangas, Philippine
This 48,000m2 floor area facility will be used to store tobacco leafs, process and final packaging. Initial design was using 40kg/m3 loose low performing type fibre. With the combined effort with our partner Infratex Environmental Services Philippines Inc – Bekaert®’s proposal was to use a high performance fibre floor solution at a lower dose rate.
Technical solution:
- 48,000 sqm
- Dramix 3D 80/60
- Cost effective dose rate
- Large pour size 20mx20m no saw cuts
- Armour edging for joint protection
Benefits
By using a Dramix solution we can offer a cost effective design dose rate of fibres offering significant saving to the main contractor. Combined with large pour sizes reducing joints offering long term maintenance savings for the end user.