HUTCHIES USE DRAMIX AGAIN AT CITISWITCH

The latest warehouse in the Citiswitch estate at Bundamba is a 25,000m2 facility being constructed by Hutchinson Builders, and they didn’t hesitate in looking to Dramix steel fibres again for the Jointless slabs. Creteco Qld were again their choice of concrete contractors, placing high standard slabs with Heidelberg Materials concrete mix.

Builder:                        – Hutchinson Builders
Engineer:                     – McVeigh
Premix Supplier:        – Heidelberg Materials
Contractor:                  – Creteco Qld

Technical solution:

  • Dramix Fibre Only