Dramix Slab on Pile the only solution for Giant Distribution

This is the first Dramix slab on pile project in Malaysia. Pile spacing is 3.2m x 3.2m grid, the slab is resting on 200mm x 200mm square pile. No pile caps are required for the construction of the slab. The floor is constructed by Asia Powermix with TK Flat Floor Malaysia.

Technical solution:

  • Slab on Pile
  • No pile cap required
  • Dramix 5D

Benefits

The placement of 14,400sqm was reduced from 3 months to just 1 month.