WESTRAC WA office adopts fibre only composite deck

In 2012, BOSFA were engaged to review the composite deck design at the new Westrac facility in Perth.
The solution provided, met the requirement’s for crack control, plus provided additional benefits for the construction program and safety on site.
The end product another example of the flexibility a Dramix solution can offer a project.

Technical solution:

  • Dramix 3D
  • 120mm
  • 25Mpa
  • 3000sqm

Benefits

Equivalent crack control
No Mesh
No Crane lifts for mesh required
reduced OHS issues associated with mesh