Complicated footings made easy with Dramix 5D
Architectural strip footings
When faced with some very intricate foundation work at Duncraig SHS in Perth, Firm construction approached their architect to consider the use of a Dramix fibre solution. With a simple dose rate of Dramix 5D we met the structural requirement’s of the footings and made the construction easier and quicker.
Technical solution:
- Dramix 5D
- 32Mpa
- No traditional reo
Benefits
Replacement of all traditional reo
Simpler, Quicker Construction
Cost effective