In 2011 CCAA was one of the largest slab completed by BOSFA at 40,000sqm. With the design efficiencies offered by the BOSFA design, the slab was reduced from 175mm to 150mm and removal of all saw cuts.
MAY 2011:
Westrn Australia – Hazelmere
Coca Cola Warehouse – 40,000 sqm
Gavin Construction
Technical solution:
- Fibre Type - DRAMIX® 3D 65/60
- Additional Reinforcement - NIL
- Reduced slab thickness from 175mm to 150mm
- Removal of all saw cuts
- 40Mpa Concrete
Benefits
- Slab reduction for the same capacity
- Large saw cut free slabs
- Reduced long term maintenance
- Fast construction