Silverdome Stadium, Launceston, Tasmania
Silverdome Upgrade the Launceston Silverdome is undergoing a $12 million – Stadiums Australia-led redevelopment, scheduled for completion in 2026/2027 to upgrade the 40-year-old venue.
Head Contractor: Beardwood
SOG Design Engineer: JMG (Launceston)
Concrete Supply: Hazell Bros
Description: Structural saw-cut topping screed 110mm thick for the Velodrome floor approx. 2400sqm