CALL 1300 665 755 (AUS) OR 0800 665 755 (NZ)

Download as PDF

Case Studies

Liquid Tight Floors / CombiSlab

BELLEVUE RAIL CART ASSEMBLY SHEDS

Government of Western Australia – Public Transport Authority

The Bellevue Rail Cart Assembly Facility was delivered for the Government of Western Australia Public Transport Authority as part of the state’s expanding rail infrastructure program.

The facility required a high-performance industrial slab capable of accommodating heavy assembly loads, maintaining tight crack control, and delivering long-term durability with minimal maintenance.

To achieve these objectives, a Dramix Combi Slab solution was adopted — combining conventional mesh reinforcement with high-performance Dramix 4D steel fibres.

The Challenge

The project presented several critical design requirements:

  • High load capacity for rail cart assembly operations
  • Efficient slab design to optimize materials and construction program
  • Controlled nominal crack widths across the entire facility
  • Reduced long-term maintenance requirements
  • Durable performance in a demanding industrial environment

Traditional mesh-only reinforcement was assessed but did not provide the same level of performance efficiency and crack control required for the asset lifecycle expectations of a government infrastructure project.

The Solution – Dramix Combi Slab

The adopted Combi Slab system incorporated:

  • Conventional steel mesh reinforcement
  • Dramix 4D high-performance steel fibres

This hybrid reinforcement approach delivers the reliability of mesh with the enhanced post-crack performance and multi-directional reinforcement of steel fibres throughout the concrete matrix.

Through careful engineering design and detailing, a nominal crack width was applied consistently across the facility — ensuring structural integrity, durability, and visual consistency.

Performance Outcomes

Superior Crack Control
Optimised Structural Efficiency
Enhanced Post-Crack Behavior
Reduced Maintenance Risk

Project Result

The Bellevue Rail Cart Assembly Facility now benefits from:

  • A durable, high-performance industrial slab
  • Improved constructability and installation efficiency
  • Long-term asset resilience
  • A technically robust and visually consistent floor system

The Dramix Combi Slab solution delivered a modern, engineered alternative to traditional reinforcement — aligning with the performance, durability, and lifecycle expectations of the Public Transport Authority.

Reinforcement Solution:
Combi Slab – Mesh + Dramix 4D Steel Fibres

Supplier:
BOSFA – Champions of Sustainability