CALL 1300 665 755 (AUS) OR 0800 665 755 (NZ)

This was a breezeway pavement for a logistics/warehousing facility with container and forklift loads. Dramix 4D Combi Slab was used to remove all the saw cuts and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.

This was a breezeway pavement for a logistics warehousing facility with container and forklift loads. Dramix 4D Combi Slab was used to remove all the saw cuts and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.

Warehouse and distribution development, with ancillary office and associated parking

Warehouse and distribution development at Dakota Business Park, Harewood, Christchurch

New build, approx 10,000 SM. Warehouse with ambient & controlled temperature used for international air & ocean freight.
2 single level warehouses and cold store industrial buildings. Both buildings have a large warehouse area & 3 level office space.

50,000m2 of completely seamless, absolutely no construction joints or saw-cuts, external pavement required to carry very heavy loads from bulk container storage and container handling equipment.

Owner: ACFS (Australian Container Freight Services) One of Australia’s largest container freight logistics providers.
Builder: Hansen Yuncken
Engineer: Northrop Consulting
Location: Port of Brisbane, QLD Australia
Application: Combi Slab