The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The new Distribution Facility for Schweppes Asahi in Brisbane includes a fully automated racking system 32 metres high, with post loads of 23 Tonnes each.
The Only suitable solution was to remove all joints and saw-cuts and design it as a fully restrained completely seamless Dramix Combi Slab

On the back of a number of successful external container pavements and due to the busy nature of the facility and the fact that joints require maintenance. The Combi Slab solution was chosen because it removed all joints including saw cuts and dowelled joints, leaving a surface that requires little or no maintenance at all. 

Concrete plant covering 2000m2. Spoon drains all over the yard to facility water management.
Detailing for joints became a major headache.

Areas where spoon drain affected the material hoppers and front end loader operation slab design changed to 4D Combislab unrestrained

The major components of this project constructed in Forrestfield, Western Australia for
Western Power consists of three large bund areas which are designed with a crack width criteria
of 0.2mm, this was achieved by using a combined reinforcing method of DRAMIX
steel fibres and traditional reinforcing.

Project Completed in 2012

Warehouse and distribution development, with ancillary office and associated parking

Warehouse and distribution development at Dakota Business Park, Harewood, Christchurch