The cracked Dramix® 5D section in bending is stronger than the uncracked section, this allowed replacement of the structural
reinforcing and in some cases enabled a re-design of the pad foundation.
This increased the speed of construction and reduced concrete wastage from overcut foundations that are common with caged foundations to guarantee minimum cover requirements. Replacing this cage resulted in time, labour and material savings and a provided a more durable structure.
TYPE OF APPLICATION: Warehouse Pad Foundations
Constructed: 2013
Location: Sydney
ENGINEER: Mott MacDonald
CONTRACTOR: Qanstruct