Placed back in 2008 this slab is utilised at the Komatsu facility in Perth. These types of slabs come under enormous stress from the equipment loading on the slabs.
Placed back in 2005 this slab is still in use and standing up to the punishment of a mining slab.
Mining workshop slab was designed for heavy mining machinery and jacking loads.
Placed back in 2008 this slab is utilised at the McMahons facility in Perth. These types of slabs were designed for their heavy machinery maintenance workshops.
Mining Workshop slab designed for heavy mining machinery – Komatsu 930 and Jacking Loads.
The Komatsu Project in Port Hedland adopted Dramix SFRC for all slabs on grade and the complete replacement of conventional reinforcing cages in the huge footings.
Constructed by Copper & Oxley in April 2014, the remote location of Port Headland, 1500km north of Perth, made Dramix fibres the ideal solution to minimise transport and labour of conventional reinforcing.