CALL 1300 665 755 (AUS) OR 0800 665 755 (NZ)

As any owner of a commercial facility knows the concrete slab is the life line of the operation, if it fails its very difficult to operate and keep up the demands of the day to day efficiencies required of any commercial operation. This is why the Dramix Combi Slab option offers such a perfect solution. With the removal of not only saw cuts but also dowelled joints, the risk of the slab not being operational from a damaged joint is completely eliminated.
With the removal of joints the overall slab can also be designed thinner and more robust and this is why container yards are now opting for this solution, the benefits far out way the risk of a failed slab.
Well done to Kerman’s, Perth Concrete Services and Holcim for an excellent job.

Griya Idola Industrial Park just launched a new industrial area in Tangerang, west of Jakarta. The pavement is prepared for heavy truck loads and long term usage. Original design is 300mm thick slab with K400 concrete reinforced by 2 layer of wiremesh M8. This was completely replaced with Dramix 3D fibres, first slab was cast in 2014 and still continue until today.

The new 27,000sqm Northline facility in Regency Park, South Australia utilised the tried and tested Dramix fibre only jointless solution for the internal slabs. With the external slabs adopting a Dramix Combi Slab, enabling the removal of all saw cuts and all dowelled joints from the pavement. Having no joints makes for the most efficient design with the additional benefit of long term reduced maintenance cost with the removal of costly jointing systems.

Design Engineers
BOSFA / FMG Engineering
Contractor
Maranello Concrete Constructions PL

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The new Kiwi Rail Locomotive wash slab in Christchurch was designed to be watertight without any joints. Dramix 5D structural steel fibre was used to provide additional capacity in the foundations and was also used in the slab to design for a nominal crack width of 0.2mm.

On the back of a number of successful external container pavements and due to the busy nature of the facility and the fact that joints require maintenance. The Combi Slab solution was chosen because it removed all joints including saw cuts and dowelled joints, leaving a surface that requires little or no maintenance at all. 

One of the major issues facing an external pavement is the required jointing. Unless regularly maintained, generally yearly and in some cases monthly these external pavements are destined to fail at some point. This can cause reduced productivity due to the failure in the slab joints and during any repairs that need to be carried out, unfortunately repairs tend to be just a band aid never really fixing the underlying issue, the joint has failed.
This is where Dramix Combi Slab can reduce and in many cases remove all the joints including saw cuts and dowelled joints, leaving a surface that will require little or no maintenance at all.

Speak to us about your next project and how Dramix Combi Slab can benefit and add value to your project.