Tomkins Commercial and Industrial Builders recently completed the new Distribution Facility for Miele appliances at Brisbane Airport. Tungsten Structures engineers worked closely with BOSFA and Menard Oceania to design this facility as a Dramix fibre only Slab-on-Piles using a CMC piling system.

Builder: Tomkins Commercial and Industrial Builders
Engineer: Tungsten Structures
Concrete Contractor: S & C Concrete Services
Concrete Supplier: Boral
Location: Brisbane Airport, QLD Australia

This is the first Dramix slab on pile project in Malaysia. Pile spacing is 3.2m x 3.2m grid, the slab is resting on 200mm x 200mm square pile. No pile caps are required for the construction of the slab. The floor is constructed by Asia Powermix with TK Flat Floor Malaysia.

The new renting warehouse for WWWHP (World Wide Warehouse Hai Phong) in Dinh Vu, is designed as a Slab on Pile to carry 4t post loads from the racking system and a UDL of up to 3t/m2.
The Dramix 5D Slab on Pile solution was chosen as the most cost effective solution, with a reduction in the slab thickness and removing up to 90% of the traditional reinforcing.

LOCATION:
Reclaimed land which couldn’t support a slab on grade