CALL 1300 665 755 (AUS) OR 0800 665 755 (NZ)

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The external yard pavements, which are heavily worked, were designed without saw cuts and had armoured full depth high moving plate dowels at 25m centres.

The new Kiwi Rail Locomotive wash slab in Christchurch was designed to be watertight without any joints. Dramix 5D structural steel fibre was used to provide additional capacity in the foundations and was also used in the slab to design for a nominal crack width of 0.2mm.

On the back of a number of successful external container pavements and due to the busy nature of the facility and the fact that joints require maintenance. The Combi Slab solution was chosen because it removed all joints including saw cuts and dowelled joints, leaving a surface that requires little or no maintenance at all. 

One of the major issues facing an external pavement is the required jointing. Unless regularly maintained, generally yearly and in some cases monthly these external pavements are destined to fail at some point. This can cause reduced productivity due to the failure in the slab joints and during any repairs that need to be carried out, unfortunately repairs tend to be just a band aid never really fixing the underlying issue, the joint has failed.
This is where Dramix Combi Slab can reduce and in many cases remove all the joints including saw cuts and dowelled joints, leaving a surface that will require little or no maintenance at all.

Speak to us about your next project and how Dramix Combi Slab can benefit and add value to your project.

External apron slabs and hardstands, 12,0002, for 100t axle load Container fork lift and containers.

Internal waste transfer processing slab 2000m2 to handle very aggressive domestic waste with low PH level.

Owner: Veolia waste management
Builder: Lipman Construction
Engineer: Costin Roe
Location: Banksmeadow, Sydney
Application: Dramix® Combi Slab

This was an internal slab for a recycling facility with heavy equipment and forklifts. Dramix 4D Combi Slab was used to remove all the joints and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.

This was an external pavement for a recycling facility with container and forklift loads. Dramix 4D Combi Slab was used to remove all the saw cuts and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.

This was a breezeway pavement for a logistics/warehousing facility with container and forklift loads. Dramix 4D Combi Slab was used to remove all the saw cuts and the inherent ongoing maintenance cost associated with saw cuts having to be re-sealed and saw cuts not initiating.