This 48,000m2 floor area facility will be used to store tobacco leafs, process and final packaging.
Initial design was using 40kg/m3 loose low performing type fibre. With the combined effort with our partner Infratex Environmental Services Philippines Inc – Bekaert®’s proposal was to use a high performance fibre floor solution at a lower dose rate. By using Dramix 3D 80/60BG, the dose rate can be reduced offering significant saving to the main contractor.